Shanghai IC-Package Industry Reclaimed Water​

    • New plant BG/DS wastewater volume: 57.4m3/hr, Produced water: back to the secondary RO inlet bucket.
    • 10CMH drainage of cooling water tower in new plant,
    • Produced water: back to the cooling water tower to make up water.
    • Old plant: DS wastewater: 3.5m3/hr Produced water: back to the tap bucket of pure water.

    Leave a Comment

    Your email address will not be published. Required fields are marked *

    Scroll to Top