- New plant BG/DS wastewater volume: 57.4m3/hr, Produced water: back to the secondary RO inlet bucket.
- 10CMH drainage of cooling water tower in new plant,
- Produced water: back to the cooling water tower to make up water.
- Old plant: DS wastewater: 3.5m3/hr Produced water: back to the tap bucket of pure water.


